HORIZON FORMWORK CO., LTD.

 

Professional manufacturer of formwork and scaffolding systems

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsClimbing Formwork System

High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material

Certification
China HORIZON FORMWORK CO., LTD. certification
China HORIZON FORMWORK CO., LTD. certification
Customer Reviews
The delivery time is quick, and very important: the products always sent match the order. I trust them because i've never been disapointed with them.

—— Laura

This mutual cooperation last for about 4 years,and must admit the service they provide is aboved expected. Our cooperation will last for many years.

—— Kresimir Brebric

I'm Online Chat Now

High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material

High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material
High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material

Large Image :  High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material

Product Details:
Place of Origin: CHINA
Brand Name: HORIZON
Model Number: HORIZON CLIMBING SYSTEM
Payment & Shipping Terms:
Minimum Order Quantity: 50 sets
Price: pls ask HORIZON
Packaging Details: pallets, bundles, bulk
Delivery Time: 20-25 days
Payment Terms: L/C, T/T
Supply Ability: 100 tons per week
Detailed Product Description
Material: H20 Beam, Steel Waling, Climbing Bracket OEM: Available
Colour: Yellow & Blue Climbing Type: By Crane Lift
Applications: For Core Wall, Bridges Piers, Etc. Cycle Time: 5-7 Days Per Cycle
High Light:

jump formwork system

,

self climbing scaffold system

High Efficient Climbing System for Construction of Core Wall and Bridge Piers

 

Climbing system CB240 is crane dependent, serving as a support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

Advantages:
Platform width:      2.4m
Roll-back system:  70 cm with carriage and rack system
Finishing platform: for removing the climbing cone, polishing concrete surface etc.
Anchor system:     should be pre-fixed into the formwork and left in the concrete after pouring.
Formwork:            can be moved horizontally, vertically and tilted to meet site requirement.
Main platform:       provide workers a safe working platform
Finishing platform: there is an access to the main platform by using a safety ladder.

 

1. Climbing bracket

 

2. Main platform

 

3. Pouring platform

 

4. Finishing platform

 

5. Roll-back system

 

6. Push-pull prop

 

7. Vertical waling

 

8. Anchor system

 

9. Formwork

 

 

Components Diagram / photo Specification / description
Climbing bracket High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 0 For all vertical formworks
H20 Timber beam High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 1

Water proof treated

Height: 200mm

Width: 80mm

Length: as per table size

Steel waling High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 2

Painted, powder coated

[12 steel channel

 

Flange clamp  High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 3

Galvanized

To connect steel waling and H20 beams

Panel strut High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 4

Painted

 

Waling connector 80 High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 5

Painted

Used for formwork panels alignment

Corner connector 60x60 High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 6

Painted

Used for forming inner corner formwork with wedge pins

Top scaffold bracket High Efficient Jump Form Formwork System Crane Lifted Steel Raw Material 7

Painted,

severs as safety working platform

 

 

 

 

Packing:
1. Generally, the total net weight of loaded container is 22 tons to 26 tons, which need be confirmed before loading.
2. Different packages are used for different products:
---bundles: timber beam, steel props, tie rod, etc.
---pallet: small parts will be put in bags and then on pallets.
---wooden cases: it is available on customer's request.
---bulk: some irregular goods will be loaded in bulk in container.


 

Delivery:
1. Production: For full container, normally we need 20-30 days after receive customer's down payment.
2. Transportation: It depends on the destination charge port.
3. Negotiation is needed for special requirements.

Who we are:
HORIZON FORMWORK is a professional formwork solution provider for years, supplying: Formwork systems, scaffolding systems and related accessories, which are widely used in commercial, residential and infrastructural projects.


What we offer:
Wall formwork, column formwork, climbing system, table formwork, flexible slab formwork, frame scaffolding system, ringlock scaffolding system, cuplock system, form-tie system, etc.
On-site supervising support is available on request.


Why us:
With 10 years of experience, we know exactly what you need;
Strict quality control in raw material selection, production line, and pre-packing, which ensures the reliable product quality as per customer's request.
Prompt action on customer's requirments.

We are not only providing excellent products, but also offering a comprehensive and complete concrete formwork and scaffolding solution to clients.


HORIZON FORMWORK, your reliable formwork partner!

 

Contact Details
HORIZON FORMWORK CO., LTD.

Contact Person: Mr. H. Chang

Tel: +86 319 3188757

Fax: 86-319-3156299

Send your inquiry directly to us (0 / 3000)