HORIZON FORMWORK CO., LTD.

 

Professional manufacturer of formwork and scaffolding systems

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsSlab Formwork Systems

Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction

Certification
China HORIZON FORMWORK CO., LTD. certification
China HORIZON FORMWORK CO., LTD. certification
Customer Reviews
The delivery time is quick, and very important: the products always sent match the order. I trust them because i've never been disapointed with them.

—— Laura

This mutual cooperation last for about 4 years,and must admit the service they provide is aboved expected. Our cooperation will last for many years.

—— Kresimir Brebric

I'm Online Chat Now

Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction

Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction
Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction

Large Image :  Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction

Product Details:
Place of Origin: China
Brand Name: HORIZON
Certification: SGS
Model Number: Joist clamping connector
Payment & Shipping Terms:
Minimum Order Quantity: 500 pcs
Price: Pls check with HORIZON
Packaging Details: pallets, bundles, bags, etc.
Delivery Time: 20-25 days
Payment Terms: L/C, T/T
Supply Ability: 10000 M2 per month
Detailed Product Description
Material: Beam Clamp, Steel Prop, Fork Head Application: Drop Beam Construction
Site Supervision: Available Type: Beam Formwork
Beam Height: Max. 900mm Supporting: Joist Clamping Connector, Steel Props
High Light:

slab shuttering system

,

slab scaffolding system

Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction
 

Flex-H20 slab formwork is the ideal system for shuttering any slabs, including drop beams.

Drop beams are always designed in many projects, which seems troublesome and cost money while constructing such beams.

Now, HORIZON beam clamps can help reduce work and cost. The beam clamp is connected to a H20 beam by easy tightening the wing nut. The timber beam is part of the bottom shuttering of the concrete beam.

Similar as Flex-H20 slab formwork stripping, it’s very easy to strip the beam formwork.

Loose the wing nut that locking the beam clamp, move back the beam clamp and take the lateral timber beam (or wood plank). Then remove the beam clamp. Now, the beam formwork and slab formwork can be taken down separately easily.

Exactly rectangular side shuttering can be formed due to the large dimension and contact area of the two clamped side forms.Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction 0

Flexible Slab Formwork, Joist Clamping Connectors​​ For Drop Beams Construction 1

 

 

 

Beam height

H (cm)

Max. Distance of beam clamps

Without slab

(m)

With slab t=20cm

(m)

With slab t=30cm

(m)

30 2.25 1.5 1.25
35 2.00 1.25 1.00
40 1.75 1.05 0.9
45 1.50 0.95 0.8
50 1.35 0.85 0.7
55 1.30 0.75 0.60
60 1.05 0.65 0.50
65 0.9 0.50 0.40
70 0.80 0.40 0.35
75 0.60 0.30  
80 0.55    
85 0.45    
90 0.35    

Contact Details
HORIZON FORMWORK CO., LTD.

Contact Person: Mr. H. Chang

Tel: +86 319 3188757

Fax: 86-319-3156299

Send your inquiry directly to us (0 / 3000)